• Home
  • About Us
  • Services
  • Projects
  • Contact Us
0422252122

  • Home
  • About Us
  • Services
  • Projects
  • Contact Us
Cut and Fill Calculation Methods for Earthwork Volumes

Cut and Fill Calculation Methods for Earthwork Volumes

by mcmahonscivilPTY | Nov 12, 2026 | General

The calculation method affects how accurately an earthworks estimate represents the ground. Cut is material excavated below existing site levels; fill is material placed above them. Both are measured in cubic metres (m³). The right cut and fill calculation methods...
Precision rock breaking for sensitive construction sites

Precision rock breaking for sensitive construction sites

by mcmahonscivilPTY | Nov 11, 2026 | General

Blasting isn’t the only way to remove hard rock. Precision rock breaking for sensitive areas uses controlled, non-explosive methods to fracture or weaken rock where conventional blasting is impractical, unapproved or undesirable. It can help manage excavation near...
Sustainable paving materials: choosing recycled and permeable options

Sustainable paving materials: choosing recycled and permeable options

by mcmahonscivilPTY | Nov 10, 2026 | General

The most sustainable paving choice isn’t automatically the one with the most recycled content. Sustainable paving materials include reclaimed asphalt, crushed concrete, recycled glass, permeable systems and natural stone, but each suits different sites and uses. A...
Concrete Hardstand Construction Specifications for Heavy Loads

Concrete Hardstand Construction Specifications for Heavy Loads

by mcmahonscivilPTY | Nov 9, 2026 | General

A hardstand isn’t simply a thicker driveway: its specification needs to reflect the heavy vehicles or equipment it will carry. For heavy-duty commercial use, concrete hardstand construction specifications recommend a slab thickness of 200-300 mm, while residential and...
How to Choose Retaining Wall Backfill for Better Drainage

How to Choose Retaining Wall Backfill for Better Drainage

by mcmahonscivilPTY | Nov 8, 2026 | General

A retaining wall can be well built and still face pressure if water has nowhere to drain. Backfilling means placing and compacting material behind the wall; choosing the right retaining wall backfill means balancing drainage, support and the project’s soil conditions....
How to prepare an industrial site for construction

How to prepare an industrial site for construction

by mcmahonscivilPTY | Nov 7, 2026 | General

A cleared block isn’t necessarily ready for construction. Site preparation for industrial facilities brings the ground and work area into line with the project’s design, typically through surveying, soil testing, clearing, grading, compaction and planning for...
« Older Entries
  • Follow
  • Follow

Grab A Free Quote



Phone

0422252122



Email

admin@mcmahonscivil.com.au


Location

80 wilkins street bellevue wa 6056

© Copyright 2023 McMahons Civil & Contracting PTY LTD. All rights reserved | Privacy Policy