Services

Our Services

Rock Pitching

Rock pitching is a specialised technique commonly used in landscaping, retaining walls, and erosion control projects. It involves the placement of large rocks to create a stable and aesthetically pleasing surface.

With over two decades of experience in rock pitching, we’ll help you select the right type and size of rocks to ensure successful rock pitching. Combined with our professional installation methods, the finished projects are not only beautiful but also long-lasting.

Earth Works

Our Earth Works service goes beyond simple excavation – it’s about transforming landscapes with precision and finesse. We understand that the foundation is key to any successful project.

Our skilled team meticulously shapes the terrain to your exact specifications, ensuring proper grading, leveling, and land preparation. Whether you’re planning a residential development, commercial construction, or any other project, our Earth Works service provides the groundwork for your vision to flourish.

Gabion Baskets

Gabion baskets are made from galvanised wire mesh that is filled with rocks or other materials, providing a cost-effective and durable solution that is both functional and visually appealing.

We have extensive experience in designing and installing gabion baskets, and our team will guide you to choose the right basket size and shape that meets the specific requirements of your project.

Reno Mattress

Erosion control meets ecological design in our Reno Mattress service. By weaving together a mesh of natural aesthetics and functional durability, we create Reno Mattresses that not only prevent soil erosion but also blend harmoniously with the environment.

These carefully arranged stone installations provide stability to slopes, riverbanks, and other vulnerable areas, offering a sustainable solution that safeguards both the land and its natural beauty.

Limestone Retaining

Elevate your outdoor space with the timeless elegance of our Limestone Retaining service. Our seasoned artisans utilize meticulously chosen limestone blocks to craft retaining walls that serve both functional and aesthetic purposes.

These walls not only provide essential structural support, preventing soil erosion and land degradation, but they also add a touch of sophistication to your landscape. Our commitment to quality craftsmanship ensures that each retaining wall seamlessly integrates into the natural surroundings, enhancing the overall appeal of your property.

Geocell

Geocell or Cellular Confinement System (CCS) is a lightweight and flexible three-dimensional, expandable panels made from High Density Polyethylene (HDPE) strips which are ultrasonically bonded together to form an extremely strong configuration.

When infilled by compacted soil, a Cellular Confinement System (CCS) creates a new entity with enhanced mechanical and geotechnical properties. When pressure is applied to the soil contained in a CCS, it results in lateral stress on the perimeter of the cell wall. The three-dimensional confinement area reduces the lateral movement of soil particles.

On the jobsite, all sections of the geocell are fastened together and placed directly on the surface of the subsoil or placed on the geotextile covered on the roadbed surface. The sections are stretched and expanded. The geocell extended to cover several tens of meters may consist of hundreds of individual cells, depending on the size of the section and the whole area. They are then filled with a variety of filler materials such as soil, sand, aggregate or recycled materials, and then compacted using vibration compaction.

Overall CCS can create a hard mattress to distribute the load over a wider area, reduce settlement of soft soil, improve shear resistance and load carrying capacity and reduce distortion.

Landscaping

Unlock the full potential of your outdoor space with our comprehensive Landscaping service. From initial concept to the final flourish, we work closely with you to bring your vision to life. Our team of landscape architects, designers, and horticultural experts collaborates to design and implement landscapes that reflect your style, preferences, and the unique features of your property.

We seamlessly blend softscapes (plants, trees, and flowers) with hardscapes (pathways, patios, and water features) to create an inviting, harmonious environment that rejuvenates the senses and enhances property value.

Rock Breaking

When challenges arise in the form of stubborn rocks and boulders, our Rock Breaking service steps in. Our cutting-edge techniques and state-of-the-art equipment allow us to expertly break down and remove obstacles, ensuring the land is primed for your projects.

Whether you’re planning construction, landscaping, or any other development, our rock breaking services are tailored to meet the specific demands of your project, ensuring efficiency and success.

Brick Paving

Brick paving is commonly used in patios, walkways, and driveways to enhance an outdoor space. It provides a sturdy surface that can hold out against heavy foot and vehicle traffic. We prioritise the quality of our finished projects, and we achieve this by utilising premium-grade materials and cutting-edge techniques in our brick paving services.

Our competence in brick paving design and installations will guarantee outstanding results that can withstand the test of time.